 |
|
Methodology to Reduce Construction Project Schedule Duration Using Activity Aggregation
|
|
Darshan Parsuvanathan Chandrasekar, Saravana Kumar
|
|
pp.
1-6
|
|
DOI:
10.5923/j.ijcem.20190801.01 3633 Views 1302 Downloads
|
|
This work and the related PDF file are licensed under a Creative Commons Attribution 4.0 International License.
|
|
|
 |
|
A Case Study on the Problems and Prospects of Output and Performance Based Road Contracting (OPRC) in Ethiopia
|
|
Getachew Yilma Debela, Gurmel Ghataora, Michael Burrow
|
|
pp.
7-18
|
|
DOI:
10.5923/j.ijcem.20190801.02 10831 Views 5385 Downloads
|
|
This work and the related PDF file are licensed under a Creative Commons Attribution 4.0 International License.
|
|
|
 |
|
A Study on Contractors’ Contractual Relationship within Joint Venture Projects in Tanzania
|
|
Godwin Maro, Stephen Mnyigumbi
|
|
pp.
19-23
|
|
DOI:
10.5923/j.ijcem.20190801.03 4242 Views 1828 Downloads
|
|
This work and the related PDF file are licensed under a Creative Commons Attribution 4.0 International License.
|
|
|
 |
|
Delay in Pipeline Construction Projects in the Oil and Gas Industry: Part 1 (Risk Mapping of Delay Factors)
|
|
Reyadh M. M. Mohammed, Saad M. A. Suliman
|
|
pp.
24-35
|
|
DOI:
10.5923/j.ijcem.20190801.04 5931 Views 1975 Downloads
|
|
This work and the related PDF file are licensed under a Creative Commons Attribution 4.0 International License.
|
|
|