[1] | Latif, M, "Simulation of Bus Manufacture", International Conference of Manufacturing and Engineering Management, July 2009, London. ISBN 978-988-17012-5-1 |
[2] | Latif, M. and Saunders, C., " A Traditional Logistics Problem", Int. Jou of Engineering Studies, 2(2), pp131-140, 2010 |
[3] | Akhtar, S. and Latif, M., "Exploiting Simulation for Call Centre Optimisation", Int. conference of Manuf. Eng and Engineering, ISSBN978-988-18210-8-9, pp2112-2117, London 2010 |
[4] | Alghadafi, E., and Latif, M., "Simulation of a Libyan Cement Factory", World Congress in Engineering 2010, July 2010, pp2293-2296 |
[5] | Ahmed, E., and Latif., M., "Exploiting Simulation for Product Returns in SMEs", WCE 2010, ISSBN978-988-18210-8-9, pp2363-2368, 2010 |
[6] | Ahmad, J., and Latif, M., "Strategies for an Elevator Dispatcher System", 1st Faculty of Science and Engineering Research and Development Day at MMU, ISBN 978-1-905476-54-1, Dec 2010 |
[7] | Alghadafi, E., and Latif, M., "Using Simulation to Optimise Supply Chain Management in a Libyan Cement Factory", 1st Faculty of Science and Engineering Research and Development Day at MMU, ISBN 978-1-905476-54-1, Dec 2010 |
[8] | Horejsi, J., Horejsi, P., and Latif, M., Strategies for an Elevator Dispatcher System, Modern Machinery (MM) Science Journal, July 2011, pp234-238 |