Methodology to Reduce Construction Project Schedule Duration Using Activity Aggregation
|
Darshan Parsuvanathan Chandrasekar, Saravana Kumar
|
pp.
1-6
|
DOI:
10.5923/j.ijcem.20190801.01 3148 Views 1107 Downloads
|
This work and the related PDF file are licensed under a Creative Commons Attribution 4.0 International License.
|
|
|
A Case Study on the Problems and Prospects of Output and Performance Based Road Contracting (OPRC) in Ethiopia
|
Getachew Yilma Debela, Gurmel Ghataora, Michael Burrow
|
pp.
7-18
|
DOI:
10.5923/j.ijcem.20190801.02 9576 Views 4704 Downloads
|
This work and the related PDF file are licensed under a Creative Commons Attribution 4.0 International License.
|
|
|
A Study on Contractors’ Contractual Relationship within Joint Venture Projects in Tanzania
|
Godwin Maro, Stephen Mnyigumbi
|
pp.
19-23
|
DOI:
10.5923/j.ijcem.20190801.03 3838 Views 1632 Downloads
|
This work and the related PDF file are licensed under a Creative Commons Attribution 4.0 International License.
|
|
|
Delay in Pipeline Construction Projects in the Oil and Gas Industry: Part 1 (Risk Mapping of Delay Factors)
|
Reyadh M. M. Mohammed, Saad M. A. Suliman
|
pp.
24-35
|
DOI:
10.5923/j.ijcem.20190801.04 4948 Views 1572 Downloads
|
This work and the related PDF file are licensed under a Creative Commons Attribution 4.0 International License.
|
|